Translation of "date of test" to Chinese language:


  Dictionary English-Chinese

Date - translation : Date of test - translation : Test - translation :

  Examples (External sources, not reviewed)

Test Date Book
测试数据簿
Date and type of most recent periodic test(s)
最近(一次)定期试验日期
Initial pressure test date and witness identification
首次压力试验日期及证人
An exceptional inspection and test shall be performed regardless of the date of the last periodic inspection and test when necessary according to 6.6.2.19.7.
按6.6.2.19.7有必要时应进行例外检查和试验 不论上次定期检查和试验的日期如何
However, an IBC filled prior to the date of expiry of the last periodic test or inspection may be transported for a period not to exceed three months beyond the date of expiry of the last periodic test or inspection.
然而 最近一次定期试验或定期检查有效期结束之前装箱的中型散货箱在各该有效期结束之后的三个月内仍可交运
However a portable tank filled prior to the date of expiry of the last periodic inspection and test may be transported for a period not to exceed three months beyond the date of expiry of the last periodic test or inspection.
但是 最近一次定期检查和试验有效期截止日之前装载的便携式罐体可在该截止日之后不超过三个月的时期内运输
The 2.5 year inspection and test may be performed within 3 months of the specified date.
2.5年检查和试验可在规定日期的3个月之内进行
In addition, an IBC may be transported after the date of expiry of the last periodic test or inspection
此外 下列情况下中型散货箱在最近一次定期试验或定期检查有效期结束之后可以交运
In addition, a portable tank may be transported after the date of expiry of the last periodic test and inspection
另外 以下条件下便携式罐体在最近一次定期试验和检查有效期截止日之后仍可交运
The Center conducts the Agency apos s research and development program, equipped with up to date test facilities.
该研究所为宇宙开发事业团实施研制方案 配备了最新式的实验设施
To date, three domestic monitoring facilities have been formally certified by the Provisional Technical Secretariat of the Preparatory Commission of the Comprehensive Nuclear Test Ban Treaty Organization.
今天 三个国内监测设施已获全面禁止核试验条约组织临时技术秘书处正式核证
An IBC should not be filled and offered for transport after the date of expiry of the last periodic test required by 16.2.6, 16.4.6 or 16.5.6, or the date of expiry of the last periodic inspection required by 16.2.7, 16.4.7 or 16.5.7.
中型散货箱在16.2.6 16.4.6或16.5.6规定的最近一次定期试验有效期结束之后或在16.2.7 16.4.7或16.5.7规定的最近一次定期检查有效期结束之后不应装箱交运
States Date of signature Date of receipt of Date of entry
国 家 签字日期
To date, 186 countries are party to the Treaty on the Non Proliferation of Nuclear Weapons and 149 countries have signed the Comprehensive Nuclear Test Ban Treaty.
迄今,已有186个国家成为 核不扩散条约 的缔约国和149个国家签署了 全面禁止核试验条约
To date, the oxidizer turbopump has satisfied its requirements for total development seconds and the first of two formal certification units has successfully completed its 20 test series.
迄今为止 氧化剂涡轮泵已达到研制时间总秒数的要求 两套正式鉴定设备的第一套已成功完成了其20次系列测试
Grammar test and spelling test
语法考试和拼写考试
M1 mass of the test platform, without the container under test
M1 试验台座的重量 不包括所试验容器
M2 actual test mass (including tare) of the container under test
M2 所试验容器的实际试验重量(包括皮重)
Type of Test
测验类型
State Date of signature Date of receipt of the
的国家名单 国 家 签 署 日 期
Date of entry into force Date due
应提交首次报告日期
State party Date of deposit Effective date
第一款发表声明的缔约国(25)
(b) Use of a seriousness test combined with an organized nature test
(b) quot 严重性检验标准 quot 与 quot 有组织性检验标准 quot 并用
And, finally, test and test it again.
最后 反复反复的测试
6.6.2.19.6 A portable tank may not be filled and offered for transport after the date of expiry of the last 5 year or 2.5 year periodic inspection and test as required by 6.6.2.19.2.
6.6.2.19.6 便携式罐体在6.6.2.19.2要求的最近一次5年或2.5年定期检查和试验有效期截止日之后不得装载和交运
6.6.3.15.6 A portable tank may not be filled and offered for transport after the date of expiry of the last 5 year or 2.5 year periodic inspection and test as required by 6.6.3.15.2.
6.6.3.15.6 便携式罐体在6.6.3.15.2要求的最近一次5年或2.5年定期检查和试验有效期截止日之后不得装载和交运
6.6.4.14.6 A portable tank may not be filled and offered for transport after the date of expiry of the last 5 year or 2.5 year periodic inspection and test as required by 6.6.4.14.2.
6.6.4.14.6 便携式罐体在6.6.4.14.2要求的最近一次5年或2.5年定期检查和试验有效期截止日之后不得装载和交运
There was strong support for continuing the discussions on the laboratory initiative and in particular for continuing, at an early date, the discussions on the two test proposals.
会议强烈支持继续讨论该实验室倡议 尤其是尽早继续讨论上述两个试验建议
Date of communication 16 April 2000 (date of initial submission)
来文日期 2000年4月16日(首次提交)
Date of communication 4 November 1991 date of initial letter
来文日期 1991年11月4日 第一封来信日期
Resolution number Date of adoption Resolution number Date of adoption
决议编号 通过日期 决议编号 通过日期
Furnished with up to date test facilities and equipment comparable to those of major laboratories throughout the world, it conducts research and development in space technology and engineering tests of satellites and launch vehicles.
筑波空间中心拥有与世界上主要实验室相当的最新试验设施和设备 其工作是进行空间技术的研究与开发 以及卫星和运载火箭的技术试验
Test
测试
test
测试
Test
测试Name
Test
测试Comment
Test...
测试...
A test desktop file to test the PackageMetaData class.
用于测试 PackageMetaData 类的 desktop 类型文件 Name
Failed to load test suite. No test executables configured.
装入测试套件失败 没有配置测试可执行文件
test support of replacedefaultroute pppd
Profile 设置
Now the CRP test is often done following a cholesterol test, or in conjunction with a cholesterol test.
CRP检测往往 跟在胆固醇含量检测之后 或者与胆固醇含量测试一同进行
Now the CRP test is often done following a cholesterol test, or in conjunction with a cholesterol test.
目前 C反應蛋白測試通常 都用作跟進膽固醇測試 或者與膽固醇測試一齊進行
When the pressure test is a part of the inspection and test, the test pressure shall be the one indicated on the data plate of the portable tank.
如检查和试验内容之一是压力试验 试验压强应是便携式罐体数据标牌上标明的数值
Subtotal, workshop and test equipment Total, workshop and test equipment
뎵볤뫍닢쫔짨놸킡볆 37 47 47 48 161
End date is before start date! Please make sure that end date comes after start date.
结束日期先于起始日期 请确定结束日期晚于起始日期

 

Related searches : Date Of Realization - Date Of Intervention - Shift Of Date - Date Of Enquiry - Date Of Reply - Date Of Restructuring - Date Of Vacation - Date Of Bottling - Date Of Build - Date Of Drawing - Date Of Born - Date Of Edition - Date Of Postage