"估价费用"的翻译 使用英语:


  字典 中国人-英语

估价费用 - 翻译 :

  例子 (外部来源,未经审查)

a 该公司的估价中没有包括期中审计的费用
a Estimated price does not include a provision for interim audits.
估计费用
cost
估计费用
Estimated cost (US )
法律援助费用和估算费用
(e) Costs of legal assistance and valuations.
委员会认为 应向它提供此类资料 同时说明在费用估计中已在使用的标准费用和单价的全部理由
The Committee believes that such information should be provided to it together with a full justification of the standard costs and unit rates that are already being used in the cost estimates.
初步费用估计
PRELIMINARY COST ESTIMATES
估计会议费用
Estimated conference cost
估计方案费用
Estimated programme costs
年度估计费用 .
VIII. ADMINISTRATIVE EXPENSES . 119
(估计费用包括13 的项目支助费用)
(Estimated costs inclusive of 13 programme support costs)
(ii) 估计项目费用
(ii) Estimated project costs
每月费用估计数
Estimated monthly cost.
单价或每日费用
Unit or daily Monthly
费用估计 设计阶段
Table 2 Cost estimates design development phase
估计方案支助费用
Estimated programme support costs
估计运费为设备价值总额的15 (1 100美元)
Freight charges are estimated at 15 per cent of the value of the items ( 1,100).
政治行动的估计费用
Report of the Secretary General
估计50 60 是空调费用
An estimated 50 60 per cent is accounted for by air conditioning.
表6 费用回收估计数
Table 6. Cost recovery income estimates
比所需费用估计数高
Higher estimated requirements.
比所需费用估计数低
Lower estimated requirements.
估计费用为21 000美元
The cost is estimated at 21,000
估计费用为18 000美元
The estimated cost is 18,000.
转发器使用费估计数
Estimated transponder user charge.
据估计,这类工作的主要支出是搬运后勤基地库存的费用,这项费用将至少达1 400万美元(假定目前库存价值为9 500万美元,而标准预算假定运费为设备价值的15 )
It is estimated that the main expense of such an exercise would be the cost of moving the Base s stockholdings, which would amount to at least 14 million (given the current stockholding value of 95 million, and the standard budgetary assumption that freight costs amount to 15 per cent of equipment value).
备件 修理和保养费编列费用是依据设备总价值7.5 的标准费率计算的(每月10 300美元),但发电机另计,发电机所需费用估计为每月16 500美元
Provision for spare parts, repairs and maintenance is based on the standard rate of 7.5 per cent of the total value of equipment ( 10,300 monthly) except for generators, for which requirements are estimated at 16,500 per month.
每月软件维持费用和许可费估计数
Estimated monthly cost for software maintenance and licences.
损失的货币价值的计算采用了一种在调查基础上的估价技术 即 或有估价 方法
The adjustment reduces the total number of treatment visits for PTSD patients to 29,615.
费用估计的细目见附表
A breakdown of the estimated costs is provided in the attached tables.
费用估计 施工文件阶段
(Thousands of United States dollars)
估计费用(美元)第1阶段
Estimated Costs (US ) Phase 1
A. 1991年初步估计的费用
A. Initial estimated cost made in 1991 0.30
费用估计数包括润滑油的费用,以燃料费用总额的10 计算(101 900美元)
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost ( 101,900).
88辆车8个月的费用估计数(155 600美元) 23辆车12个月的费用估计数(61 000美元) 一辆租用车6个月的费用估计数(1 300美元) 以及按汽油全部费用的10 计算的润滑油费用估计数(21 800美元),扣除10 的非道路因素(24 000美元),共计215 700美元
The cost estimates provided for 88 vehicles for 8 months ( 155,600), 23 vehicles for 12 months ( 61,000), one rented vehicle for 6 months ( 1,300) and lubricants at 10 per cent of the total cost of petrol ( 21,800), adjusted by an off road factor of 10 per cent ( 24,000), for a total of 215,700.
审计可以证实,这一价值基本上是最初成本价加上建造以来所有改造或翻修的费用,再加上每年4 的重估价的调升
As far as the audit could ascertain, this value is essentially the original cost price plus the cost of any improvements or renovations since construction, plus an annual revaluation increment of 4 per cent.
估计费用中包括润滑油,以燃料费用总额的10 计算
The cost estimate includes provision for lubricants, calculated at 10 per cent of total fuel cost.
所需费用是用于银行手续费,估计数额是2 500美元
Requirements for banking charges are estimated at 2,500.
五. 各项建议的费用估计数
Cost estimates of the proposals
估计数只是每日津贴费用
The estimates simply referred to the per diem costs.
所需费用估计为18 000美元
Requirements are estimated at 18,000
所列经费30 000美元用于根据每月估计费用2 500美元的费率计算的着陆费和地勤费用
Provision of 30,000 is made for landing fees and ground handling charges at an estimated monthly cost of 2,500.
经费还用于支付运费,运费按设备价格15 计算
Provision is also made for freight at 15 per cent of the cost of the equipment.
有时 评估的费用超过了干预本身的花费
In some instances, evaluation has proved more costly than the intervention itself.
节余未支用500美元的原因是购买地图的费用比估计费用低
The unutilized balance of 500 was due to the lower than estimated cost of maps.
民用和军用车的费用估计数从每日的4.40美元减至3.81美元,因为燃料从每公升0.35美元减至0.25美元,润滑油价格略微上升抵消了所有的费用
The estimates for civilian and military vehicles have been reduced from a daily cost of 4.40 to 3.81 owing to the decrease in the cost of fuel from 35 to 25 cents per litre, offset by minimal increases in the cost of lubricants.

 

相关搜索 : 估价费 - 估价费 - 免费估价 - 估计费用 - 费用估算 - 估计费用 - 评估费用 - 估计费用 - 估计费用 - 费用估算 - 估计费用 - 评估费用 - 评估费用 - 预估费用