"索赔的限制"的翻译 使用英语:


  字典 中国人-英语

索赔的限制 - 翻译 :

  例子 (外部来源,未经审查)

第三方索赔 时间限制和财务限制
Third party liability temporal and financial limitations
第三方索赔 时间限制和财务限制
Third party liability temporal and financial limitations
(h) 秘书长关于第三方索赔的时间限制和财务限制的报告(A 51 903)
(h) Report of the Secretary General concerning temporal and financial limitations on third party liability claims (A 51 903)
至于时效限制不适用于民事索赔 似乎没有理由做这种限制
There seems no reason to limit the non applicability of statutory limitations to civil claims for reparations.
例如 在 quot C类索赔 quot 报告中 收入损失的索赔限额是 索赔人月薪金额的七倍
For example, in the C Report, income loss claims were limited to seven times a claimant s monthly salary. C Report, pp. 192 93.
因此 井喷控制索赔修订后的索赔额为950,715,662美元
Accordingly, the WBC Claim as amended amounts to US 950,715,662.
此外 小组认定 信赖这件经修改的 D 类索赔及其证据就等于允许这名个人索赔人在索赔提交最后期限之后提交新的索赔
Further, the Panel finds that to rely on the revised category D claim and its supporting evidence would be tantamount to allowing the individual claimant to file a new claim after the deadline for filing of claims.
因此 伊朗本可以在这些时限内将这些索赔单元列入它提交的索赔
Iraq contends that Iran has not provided sufficient evidence to support the claim unit, and that the documentation and information provided are inadequate.
(a) 对有理由的索赔不应规定上限
(a) No upper limits be placed on justified claims
22. 经索赔人修订的井喷控制索赔要求可以分析如下
The WBC Claim as amended by the Claimant can be analyzed as follows
8. 口头诉讼后 索赔人修订了井喷控制索赔要求 将索赔额减少了915,209美元
Subsequent to the oral proceedings the Claimant amended the WBC Claim, which resulted in a reduction of the amount claimed by US 915,209.
1. 下列索赔提交期限予以延长
1. The established filing deadlines are extended for the following claims
因此 合同利润损失索赔已超过时限 小组审议了原应收款损失索赔
Accordingly, the claim for loss of profits on contracts is time barred and the Panel has considered the original claim for the loss of receivables.
在2005年6月届会上 理事会确定 目前未找到索赔者的政府 查找此类索赔者并将找到的任何索赔者通知秘书处 以使索赔者能够收到赔款 其最后期限为2006年9月30日
At its June 2005 session, the Governing Council established a final deadline of 30 September 2006 for submitting Governments with currently unlocated claimants to locate such claimants and to inform the secretariat of any claimant who was located so that the claimant could receive payment of his or her compensation award.
索赔被认定可能与 E4 类索赔重叠的个人索赔人提供了更多的证据 并且就 E4 类索赔人索赔的损失之外的损失提出索赔
The individual claimant whose claim had been identified as potentially overlapping with the E4 claim provided additional evidence and claimed for losses in addition to those losses claimed by the E4 claimant.
在仔细审查了索赔人最初提出和叙述其索赔的方式 及其在第15条 34条答复中重新定性的方式之后 小组认为 索赔人是在提交期限过后设法提出一些新的索赔
Having carefully examined the manner in which the claimant originally presented and described his claim and the manner in which he re characterized it in his article 15 34 response, the Panel is of the view that the claimant is attempting to advance a number of new claims after the filing deadline.
负责审查井喷控制索赔要求( quot WBC索赔 要求 quot )的专员小组报告和
EXECUTIVE SUMMARY OF THE REPORT AND RECOMMENDATIONS MADE BY THE PANEL OF COMMISSIONERS APPOINTED TO REVIEW THE WELL BLOWOUT CONTROL CLAIM
117. 索赔人索赔其非股份制企业因伊拉克入侵和占领科威特而蒙受的D8 D9商业损失索赔171,000,600美元
This claimant seeks compensation in the amount of USD 171,000,600 for D8 D9 business losses allegedly sustained by his unincorporated business as a direct result of Iraq's invasion and occupation of Kuwait.
最近对死亡抚恤金和残疾津贴的赔偿及第三方索赔的赔偿责任已规定限额
Such a limit has been introduced recently in respect of reimbursements for death and disability benefits compensation and liability for third party claims.
69 第三批 F4 索赔中的第5000450号索赔和第四批 F4 索赔中的第5000454和5000466号索赔
Third F4 instalment, claim No. 5000450 and fourth F4 instalment, claim Nos. 5000454 and 5000466.
索赔缺少索赔人的签字或代表索赔人提交索赔的人缺乏授权行动的证明
These claims lack either the claimant's signature or evidence of authority to act on the part of the individual who filed the claim on behalf of the claimant.
监督厅发现 索赔人滥用赔偿制度 在科威特境内会计公司的协助下提出虚假的索赔
The Office found that claimants had abused the system by filing false claims with the assistance of accounting companies in Kuwait.
523. 伊拉克称这个索赔单元应予驳回 因为索赔是在可适用的最后期限过了之后提交的
Saudi Arabia states that all the compensatory projects should be viewed holistically as measures to compensate for the damage to its resources.
第六批索赔中一项索赔要求经查与第五批索赔中已获赔偿的索赔要求发生重复
One claim in the sixth instalment was found to be a duplicate of a claim awarded compensation in the fifth instalment.
经查 共发现37件相同索赔 这些索赔或是与同一索赔人在 贝都因人 方案中提交的索赔相关 或是与同一索赔人在不同索赔类别中提交的索赔相关
A total of 37 confirmed matches were identified, which related either to claims filed by the same claimant within the bedoun programme or to claims filed by the same claimant in different claim categories.
具体说 秘书处在计算索赔人的D6(收入损失)索赔时 错误地将它处理为索赔人的C6(工资损失)的重叠索赔 错误地扣减了裁定给索赔人的C6索赔的赔偿额
Specifically, the secretariat, in valuing the claimant's D6 (loss of income) claim, incorrectly treated it as a duplicate of the claimant's C6 (salary loss) claim, resulting in an erroneous reduction of the amount of compensation awarded to the claimant for his C6 claim.
68. 例如 在赔委会第3011224号索赔中 索赔人除了索赔自己的损失外 还索赔其丈夫的工资损失
For example, in UNCC claim No. 3011224 the claimant asserted, in addition to her own losses, a salary loss on behalf of her husband.
因此 所有索赔人 包括1997年10月1日关于埃及工人赔偿要求的第43号决定第5段所指的索赔人 均有权通过其他机制索赔
Thus, all claimants have the right to pursue their claims through other mechanisms. This includes claimants covered by paragraph 5 of Decision 43, taken on 1 October 1997, concerning the Egyptian Workers Claims.
30. 第四批中的一些索赔缺乏 (a) 确认索赔中提供的信息以及索赔损失的索赔人的签名 或者 (b) 代表索赔人提交索赔的个人的受权证明
Some claims in the fourth instalment lacked either (a) the claimant's signature affirming the information provided in the claim and the losses being claimed, or (b) evidence of authority on the part of the individual who filed the claim on behalf of the claimant.
1. 1993年7月30日 科威特石油公司(K.S.C)( quot KOC quot 或 quot 索赔人 quot )向联合国赔偿委员会( quot UNCC quot 或 quot 委员会 quot )提出了一份索赔要求 索赔人称之为 quot 井喷控制索赔 quot ( quot WBC索赔 quot )
GE.96 64795 Introduction On 30 July 1993, KUWAIT OIL COMPANY (K.S.C.) ( KOC or the Claimant ) filed with the United Nations Compensation Commission (the UNCC or the Commission ) a claim referred to by the Claimant as the Well Blowout Control Claim (the WBC Claim ).
第四组重叠索赔中的多数索赔是一个 E4 类索赔人和作为 E4 类索赔人公司股东的一名个人索赔人提交的
The majority of the claims in the fourthsecond group of overlapping claims were filed by an E4 claimant and an individual claimant who was a shareholder of the E4 claimant company.
第一批 F4 索赔裁定资助的伊朗索赔的监测和评估活动并且与第5000287号索赔相关的索赔 是第5000392 5000393和5000395号索赔
The monitoring and assessment claims of Iran that were awarded funding in the first F4 instalment and are relevant to claim No. 5000287 are claim Nos. 5000392, 5000393 and 5000395.
19. 第四组重叠索赔最初共有件与件 C 类索赔和 D 类索赔相关的 E4 类索赔
The fourthsecond group of overlapping claims initially consisted of E4 claims related to 39seven category C claims and 24 category C and D claims.
第五索赔单元是关于索赔准备费用索赔
Iran, therefore, could have included these claim units in the submissions that it filed within these deadlines.
10. 由于提交的 贝都因人 的索赔件数很多以及 贝都因人 方案的完成面临着时间限制 小组被请求采用快速程序审查 贝都因人 的索赔
Due to the large number of bedoun claims filed and the time constraints for the completion of the bedoun programme, the Panel was requested to adopt expedited procedures in its review of bedoun claims.
重复索赔 一名索赔人在迟交的索赔方案中同一类别内提交的两件或更多索赔
duplicate claims Two or more claims filed by a claimant under the late claims programme in the same category.
第二批索赔中报告的两项索赔要求经查与同一批索赔中的索赔要求发生重复
JordanTwo claims reported in the second instalment were found to be duplicates of claims also reported in the same instalment.
在A类索赔中 通过A类专员小组设计的机制共更正重复索赔45 000个
In total, over 45,000 duplicate claims in category A claims had been corrected through the mechanisms designed by the category A Panel.
28. 在经查发现可能与 E4 类索赔重叠的个人索赔中的2件索赔中 小组认为 这些索赔不属于重叠索赔 因为个人索赔人要求赔偿的损失与 E4 类索赔公司相关但不是重叠损失(例如 个人索赔人就工资损失或管理费要求 E 类索赔人提供赔偿)
In twofive of the individual claims identified as potentially overlapping with E4 claims, the Panel considers that the claim wass were not overlapping as the individual claimant was weres claiming losses that were related to the E4 claimant companies but were not overlapping losses (for example, where the individual claimant is seeking compensation for a loss of salary or management fee from the E4 claimant).
本批索赔的平均索赔金额约为200万美元 而正常 D 类索赔方案的所有索赔约为820,000美元 约旦索赔约为934,000美元 科威特索赔约为861,000美元
The average amount claimed for the claims in this instalment is about USD 2 million, compared to about USD 820,000 for all claims, about USD 934,000 for Jordanian claims and about USD 861,000 for Kuwaiti claims in the regular category D claims programme.
本批索赔的中位索赔金额约为470,000万美元 而正常 D 类索赔方案的所有索赔约为263,000美元 约旦索赔约为335,000美元 科威特索赔约为276,000 美元
The median amount claimed is about USD 470,000 for claims in this instalment, compared with about USD 263,000 for all claims, about USD 335,000 for Jordanian claims and about USD 276,000 for Kuwaiti claims in the regular category D claims programme Approximately 75 per cent of the claims in this instalment contain D8 D9 business losses in relation to unincorporated establishments in Kuwait.
34. E4 类索赔人Al Nuwaisib Building Requirement的索赔最初是在第十八批 E4 类索赔中审议的 小组当时认为 这项索赔与另一名个人索赔人提交的1件 C 类索赔重叠
The E4 claimant Al Nuwaisib Building Requirement was originally considered in the eighteenth instalment of E4 claims where it had been considered as overlapping with a category C claim filed by a different individual claimant.
72. 如上所述 合格的 D 类巴勒斯坦 迟交索赔 与正常 D 类索赔方案的索赔相比每件索赔的损失种类更多 索赔额更大 因此索赔有可能高估
As stated above, the eligible category D Palestinian late claims have a higher incidence of loss types and higher amounts claimed than claims in the regular category D claims programme, giving rise to a potential risk of overstatement of the claims.
索赔准备人常常比索赔人更了解索赔情况
At times the claim preparers appeared to be more familiar with the claims than the claimants.
小组认为这个索赔属于索赔准备费用索赔
In the view of the Panel, this should involve the services of a qualified senior epidemiologist.

 

相关搜索 : 索赔期限 - 有限索赔 - 索赔期限 - 索赔控制 - 制定索赔 - 赔偿的索赔 - 索赔 - 索赔 - 索赔 - 索赔。 - 索赔 - 索赔 - 索赔 - 索赔