"计费级"的翻译 使用英语:
字典 中国人-英语
计费级 - 翻译 :
例子 (外部来源,未经审查)
所需资源(重计费用前) 本次级方案完全由预算外资源提供经费 | Resource requirements (before recosting) this subprogramme is funded solely from extrabudgetary resources |
33.37 所需经费估计数1 978 700美元中包括所增加的878 700美元的费用 这一估计数将用于联合国对本次级方案下的外地支助费用所分担的费用 | 33.37 The estimated requirements of 1,978,700, including an increase of 878,700, will provide for the United Nations share of field support costs under this subprogramme. |
为预算目的,2 000个国际人 月的费用已经按P 3级计算 | For budgetary purposes, the cost of the 2,000 international person months had been calculated at the P 3 level. |
咨询委员会获悉 高级代表办公室的人事费和其它费用是通过开发计划署筹措的 | The Advisory Committee was informed that the staff and other expenses of the Office of the High Representative are funded through the United Nations Development Programme (UNDP). |
已开列预算经费供2 403个人 月使用,按照G 4级年度费用14 200美元计算(2 843 600美元) | Budgetary provision was made for 2,403 person months based on an annual cost of 14,200 at the G 4 level ( 2,843,600). |
20. 执行局核可了分阶段公布消费和全部国内总产值的初级和终级购买力平价的计划 | The Board endorsed the plan to publish both preliminary and final PPPs and to publish in stages for consumption and the full GDP. |
专家服务司旅费增加的提议,主要归因于报酬和叙级政策科预计的需要 应当指出,该厅其他次级方案的旅费将大幅减少 | The proposed increase in travel funds for the Specialist Services Division was primarily attributable to the expected needs of the Compensation and Classification Policy Section it should be noted that travel funds for the Office s other subprogrammes were to be significantly reduced. |
通过采用营养分析 把第二和第三级消费品的生物量损失折算成一级消费品生物量损失单位的估计数 科威特估计其水生生物群的损失数量为70,000吨虾生物量 | The Panel notes that the mudflats are characterized by low levels of oil contamination, and the evidence provided is not sufficient to demonstrate that the contamination is causing environmental damage. |
次级方案1所需经费估计数中与全球人权报告有关的非员额经费也应该减少1 380 000美元 | Estimated requirements for subprogramme 1 should also be reduced by 1,380,000 for non post requirements relating to the Global Human Rights Report.2 |
四.6. 次级方案3下 其他人事费拟议所需经费为116 600美元 重计费用前 比2004 2005年的批款110 000美元增加了6 600美元 | IV.6 Under subprogramme 3, proposed requirements for other staff costs amount to 116,600 (before recosting), which is 6,600 more than the 2004 2005 appropriation of 110,000. |
重计费用后 合 计 | Total after recosting |
目前正在拟定适当的方式 以收回开发计划署在总部一级和国家一级向资发基金提供的服务费用 | The appropriate format for cost recovery for services provided by UNDP to UNCDF at both headquarters and country levels is under preparation. |
费用估计 设计阶段 | Table 2 Cost estimates design development phase |
尽管估计所需费用是按照G 2职等第一级适用的薪金表计算的 但70 工作人员的职等都较高 | While the estimated requirements were based on the salary scale applicable to the G 2 step 1 level, 70 per cent of the staff were at higher grade levels. |
1. 工资和共同人事费 根据2005年头三个月的实际工资费用确定概算中人事费的标准费用(以美元计) 经过调整以考虑到2006 2007年职级的提升 | Methodologies used to calculate costs Staff costs Salary and common staff costs The standard costs (in United States dollars) applied in determining staff costs in the proposed budget are based on actual salary costs for the first three months of 2005, and adjusted for step increments in 2006 2007. |
审计费用 | Audit costs |
计费结构 | (e) The effectiveness of procurement training had not been evaluated at MINURSO, UNLB, UNMIL and UNOMIG. |
计费信息 | Billing Information |
计费管道 | Expenses conduit |
估计费用 | cost |
共计费用 | Total proposed inventory |
估计费用 | Estimated cost (US ) |
㈢ 审计费用 | (iii) Audit costs |
所列经费30 000美元用于根据每月估计费用2 500美元的费率计算的着陆费和地勤费用 | Provision of 30,000 is made for landing fees and ground handling charges at an estimated monthly cost of 2,500. |
所列经费是预算期间外部审计的费用估计数 | Provision is made for the estimated cost of external audit for the budgeted period. |
大会还核准在日内瓦办事处进行一次性安全升级 估计费用为35.1百万美元 | The Assembly has also approved one time security upgrades at the United Nations Office at Geneva with an estimated cost of 35.1 million. |
2001 2003年会费分摊等级 | Assignment of contribution levels for 2001 2003 |
义务性免费初级教育 | Obligatory and free of charge primary education |
207. 1998 1999两年期审计费用总额计达924 300美元,其中527 100美元为内部审计费,397 200美元为外部审计费 | The total audit costs for the biennium 1998 1999 amounted to 924,300, of which 527,100 was for internal audits and 397,200 for external audits. |
将 quot 重计费用前合计 quot 与 quot 重计费用 quot 相加后便得出提要 | Adding quot total before recosting quot and quot recosting quot yields the outline. |
电费和运水费比估计的低 | Lower than estimated electricity costs and cost of water delivery. |
估计费用中开列经费用于支付出差生活津贴,D 2和D 1级工作人员729个人 日每日99元(72 200美元)以及58 798人日,每日90元计算(5 291 800美元),共计5 364 000美元 | Provision was made in the cost estimates for payment of mission subsistence allowance for 729 person days at 99 per day for staff at the D 2 and D 1 levels ( 72,200) and for 58,798 person days at a rate of 90 per day ( 5,291,800), for a total of 5,364,000. |
预计核减经费共计 (944 000) | Total projected reduction in expenditures (944 000) |
4. 重计费用 | Recosting |
低级计算机 | Computer Weak |
中级计算机 | Computer Normal |
差旅费 总计 | Travel of staff |
运费以25 计 | Freight at 25 per cent |
运费,按15 计 | Freight, at 15 per cent |
㈠ 计算机费用 | (i) Computer costs |
计算机费用 | Computer costs |
(a) 审计费用 | (a) Audit costs |
C..审计费用 | Total audit costs |
关于在区域和国家两级提供技术援助的2006年工作计划各项要素的费用摘要 | Summary of the costs of the individual elements of a work plan on the regional and national delivery of technical assistance for 2006 |
所需经费是根据国际工作人员出缺率为10 ,当地一级没有空缺的情况计算的 | The requirements are made on the basis of a 10 per cent vacancy rate for international staff and full incumbency at the local level. |
相关搜索 : 计费 - 计费 - 计费 - 计费 - 计费,费用 - 计费收费 - 计费费用 - 电费计费 - 计量计费 - 计费计划 - 审计级 - 估计级 - 声级计 - 声级计