"project monitoring"的翻译 使用中文:


  字典 英语-中国人

Monitoring - translation : Project - translation : Project monitoring - translation :

  例子 (外部来源,未经审查)

Project monitoring
项目监督
Project development support and monitoring.
项目开发支助和监测
Project participants shall implement the monitoring plan contained in the registered project design document.
56. 项目参与方应执行已登记的项目设计书所载监测计划
Project participants shall implement the monitoring plan contained in the registered project design document.
27. 项目参与方应执行已登记的项目设计书内所包含的监测计划
The monitoring plan for a small scale CDM project activity may use the monitoring methodology specified in appendix B for the relevant project category if the designated operational entity determines at validation that the monitoring methodology reflects good monitoring practice appropriate to the circumstances of the project activity.
33. 清洁发展机制的一项小规模项目活动的监测计划 可采用附录B为相关项目类别规定的监测方法 但条件是经指定经营实体在审定时认定 所涉监测方法体现了与项目活动的具体情况相适应的良好的监测做法
The monitoring plan for a proposed small scale afforestation or reforestation project activity under the CDM may use the monitoring methodology specified in appendix B for the relevant project activity if the DOE determines at validation that the monitoring methodology reflects good monitoring practice appropriate to the circumstances of the project activity.
24. 如果指定经营实体在审定时认定 有关监测方法反映适合项目活动情况的良好监测做法 清洁发展机制之下拟议的小规模造林或再造林项目活动的监测计划可使用附录B为有关项目活动规定的监测方法
Project participants shall include, as part of the project design document, a monitoring plan that provides for
53. 项目参与方应在项目设计文件中列入监测计划 监测计划应规定
Project participants shall include, as part of the project design document, a monitoring plan that provides for
25. 项目参与方应在项目设计书中列入监测计划 监测计划应规定
The Board notes the progress made in monitoring project budgets.
640. 委员会注意到监测项目预算取得的进展
Project participants may use the simplified baseline and monitoring methodologies specified in appendix B for their project category.
14. 项目参与方可使用附录B中为其项目类别规定的简化基准和监测方法
Project participants shall include, as part of the project design document for a small scale CDM project activity or bundle of small scale CDM project activities, a monitoring plan.
32. 项目参与方应将一项监测计划列入清洁发展机制小规模项目活动或清洁发展机制的一批捆绑的小规模项目活动的项目设计书中
Project activities may be bundled or portfolio bundled at the following stages in the project cycle the project design document, validation, registration, monitoring, verification and certification.
为了降低交易费用 对于清洁发展机制小规模项目活动 将模式和程序简化如下 可在项目周期下列阶段对项目活动加以捆绑或组合捆绑 项目设计书 审定 登记 监测 核查及核证
Third claim unit Long term monitoring and assessment project Iran seeks compensation in the amount of USD 50,000,000 for a long term monitoring and assessment project to ascertain damages to its agricultural resources.
125. 伊朗要求赔偿为确定其农业资源遭受损害而开展的长期监测和评估项目的费用50,000,000美元
If bundled project activities are registered with an overall monitoring plan, this monitoring plan shall be implemented and each verification certification of the emission reductions achieved shall cover all of the bundled project activities.
如捆绑的项目活动与一项总体监测计划一同登记 这项监测计划应得到执行 对实现的排减量的每次核查 核证都应涵盖所有捆绑的项目活动
These discussions complemented information from existing surveys and reports based on project monitoring.
28. 这些讨论的结果对从现行各项调查获得的信息和资料以及根据项目监测情况编制的报告起到了补充作用
Project participants may use the simplified baseline and monitoring methodologies specified in appendix B.
6. 项目参与方可使用附录B规定的简化的基准和监测方法
Indicative simplified baseline and monitoring methodologies for selected small scale CDM project activity categories
某些清洁发展机制小规模项目活动 类别的简化基准和监测方法
Project participants shall implement the monitoring plan contained in the registered project design document, archive the relevant monitored data and report the relevant monitoring data to a designated operational entity contracted to verify the emission reductions achieved during the crediting period specified by the project participants.
35. 项目参与方应执行登记的项目设计书所载的监测计划 获取相关的监测数据 并将相关的监测数据报告给依据合同负责核查项目参与方在入计期内实现的排减量的一个指定经营实体
An overall monitoring plan that monitors performance of the constituent project activities on a sample basis may be proposed for bundled project activities.
可为捆绑的项目活动提出通过抽样对其中各项目活动绩效进行监测的总体监测计划
An overall monitoring plan that monitors performance of the constituent project activities on a sample basis may be proposed for bundled project activities.
可以为捆绑的项目活动提出一项总体监测计划 该计划以抽样方式对各部分项目活动的执行情况进行监测
If bundled project activities are registered with an overall monitoring plan, this monitoring plan shall be implemented and each verification certification of the net anthropogenic removals by sinks achieved shall cover all of the bundled project activities.
如果捆绑的项目活动在登记时具有一个总体监测计划 应执行该监测计划 对所实现的人为汇净清除量的每项核查 核证应涵盖捆绑的所有项目活动
Project participants shall implement the monitoring plan contained in the registered project design document, archive the relevant monitored data and report the relevant monitoring data to a DOE contracted to verify the net anthropogenic greenhouse gas removals by sinks achieved during the crediting period specified by the project participants.
26. 项目参与方应执行已登记的项目设计书内所包含的监测计划 归档有关的监测数据并向按照合同负责核查项目参与方规定的入计期内所实现温室气体人为汇净清除量的指定经营实体报告有关监测数据
The project participants shall provide to the DOE contracted by the project participants to perform the verification, a monitoring report in accordance with the registered monitoring plan set out in paragraph 25 above for the purpose of verification and certification.
30. 项目参与方应按照上文第25段所列登记的监测计划为核查和核证目的向与项目参与方订立核查任务合同的指定经营实体提供一份监测报告
The project participants shall provide to the DOE contracted by the project participants to perform the verification a monitoring report in accordance with the registered monitoring plan set out in paragraph 23 above for the purpose of verification and certification.
29. 项目参与方应按照上文第23段所列登记的监测计划为核查和核证目的向与项目参与方订立核查任务合同的指定经营实体提供一份监测报告
i. Where appropriate, an outline for monitoring and management programmes and plans for post project analysis
i. 视情况 监测和管理方案以及项目后分析计划的大纲
Two publications, a monitoring and evaluation guide and a project cycle manual, were issued in 2003.
2003年发表了两份出版物 一份是监测和评价指南 另一份是项目周期手册
Project participants involved in small scale CDM project activities may propose changes to the simplified baseline and monitoring methodologies specified in appendix B or propose additional project categories for consideration by the Executive Board.
15. 参与清洁发展机制小规模项目活动的项目参与方 可提出附录B规定的简化基准和监测方法的修改建议或提出附加项目类别供执行理事会审议
The project participants shall provide to the designated operational entity, contracted by the project participants to perform the verification, a monitoring report in accordance with the registered monitoring plan set out in paragraph 53 above for the purpose of verification and certification.
60. 项目参与方应按照上文第53段所列登记的监测计划为检查和核证目的向与其就核查任务订立合同的指定经营实体提供一份监测报告
The project participants shall provide to the designated operational entity, contracted by the project participants to perform the verification, a monitoring report in accordance with the registered monitoring plan set out in paragraph 32 above for the purpose of verification and certification.
39. 项目参与方应按照上文第32段所述的登记的监测计划 为核查和核证目的向与其订约负责进行核查的指定经营实体提供一份监测报告
The regional precursor control project has concluded the required normative and monitoring work by creation of new laws and monitoring structures in the region and the remaining project funds were redirected in mid 2005 to support law enforcement action against precursor trafficking.
区域前体管制项目通过在本区域建立新的法律和监测机构 完成了所需的规范工作和监测工作 2005年中 项目的剩余资金改用于支持打击前体贩运活动的执法行动
Establishment of a Project Development and Implementation Unit (PDIU) Modernisation of Regional Procedures and Monitoring Mechanisms (ICT)
区域程序和监测机制的现代化 (ICT)
The size of the total bundle should not exceed the limits stipulated in paragraph 6 (c) of decision 17 CP.7 The requirements for the project design document are reduced Baselines methodologies by project category are simplified to reduce the cost of developing a project baseline Monitoring plans are simplified, including simplified monitoring requirements, to reduce monitoring costs The same operational entity may undertake validation, and verification and certification.
总的捆绑规模不应超出第17 CP.7号决定第6段(c)分段规定的限度 减少对项目设计书的要求 简化各项目类别的基准方法 以降低拟订项目基准的费用 简化监测计划 包括简化的监测要求 以降低监测费用 同一经营实体可以负责进行审定 核查和核证工作
(c) A training phase that will ensure that all programme, project and field personnel are trained in the entire project cycle (conceptualization, formulation, financing, implementation, monitoring and evaluation).
(c) 培训期 确保整个项目周期 构想 拟订 供资 执行 监测和评价 中的所有方案 项目和外勤人员都接受培训
A monitoring plan for a proposed afforestation or reforestation project activity under the CDM shall be based on a previously approved monitoring methodology or a new methodology appropriate to the afforestation or reforestation project activity, in accordance with paragraphs 12 and 13 above, that
26. 清洁发展机制之下拟议的造林或再造林项目活动的监测计划应按照上文第12和第13段 以适合于造林或再造林项目活动的先前核准的监测方法或新方法为基础
In the area of programme and project management, UNDP acknowledges the priority attached by the Board to monitoring the correlation between reported expenditures and the project implementation status (para.
46. 在方案和项目管理方面 开发署确认委员会优先重视监测报告的支出与项目执行情况的相关关系 第190段
A monitoring plan for a proposed project activity shall be based on a previously approved monitoring methodology or a new methodology, in accordance with paragraphs 37 and 38 above, that
54. 拟议项目活动的监测计划应按照上文第37和第38段 以先前核准的监测方法或新方法为基础
In 1992 a project was initiated in South Africa to develop a monitoring system for drought and vegetation conditions.
33. 1992年 在南非开始实施了一个干旱和植被状况监测系统开发项目
Project participants involved in small scale afforestation and reforestation project activities under the CDM may propose changes to the simplified baseline and monitoring methodologies specified in appendix B or propose additional project types for consideration by the Executive Board.
7. 清洁发展机制之下小规模造林和再造林项目活动的项目参与方可提议修改附录B规定的简化的基准和监测方法 或提议增加项目类型 供执行理事会审议
They were monitored through a project ledger account (X21), cleared quarterly after a subproject monitoring report had justified their use.
通过项目分类账账户(X21)对其进行监测 每季度在次级项目监测报告说明其使用理由后结清
They were monitored through a project ledger account (X21), cleared quarterly after a subproject monitoring report had justified their use.
通过项目分类账账户 X21 对其进行监测 每季度在次级项目监测报告说明其使用理由后结清
Terms of reference for establishing guidelines on baselines and monitoring methodologies for afforestation and reforestation project activities under the CDM
制订清洁发展机制之下的造林和再造林项目 活动基准和监测方法指南的职权范围
A project procedures manual, issued in December 2003, sets out procedures for the authorization and monitoring of advance allotments to projects.
2003年12月发布了项目程序手册 阐明了授权和监测项目预先拨款的程序
In order to reduce transaction costs, these modalities and procedures are simplified for small scale afforestation and reforestation project activities under the CDM as follows Project activities may be bundled or portfolio bundled at the following stages in the project cycle the project design document, validation, registration, monitoring, verification and certification.
为减少交易费用 对于清洁发展机制之下的小规模造林和再造林项目活动 将这些模式和程序简化如下 可在项目周期的下列阶段对项目活动加以捆绑或组合捆绑 项目设计书 审定 登记 监测 核查和核证
Is determined by the designated operational entity as appropriate to the circumstances of the proposed project activity and has been successfully applied elsewhere Reflects good monitoring practice appropriate to the type of project activity.
由指定经营实体确定为适合拟议项目活动的情况 并在别处曾经成功地适用 体现适用于项目活动类型的良好的监测方法
Indicative simplified baseline and monitoring methodologies for selected types of small scale afforestation and reforestation project activities under the clean development mechanism
关于清洁发展机制之下某些类型的小规模造林和 再造林项目活动的提示性简化基准和监测方法

 

Related searches : Monitoring Project - Project Monitoring Services - Cardiac Monitoring - Monitoring Software - Monitoring Station - Trend Monitoring - Vibration Monitoring - Flow Monitoring - Cost Monitoring - Alarm Monitoring - Monitoring Procedures - Budget Monitoring